NEXUS TECHNOLOGY

Prepare the operational context before choosing a topology.

A practical preparation guide for assets, signals, roles and deployment requirements.

Assets and signals

Describe asset types, locations, available telemetry and existing gateways. Identify gaps, ownership and access restrictions.

Operational decisions

List current rules, alarm response, escalation and evidence requirements. Identify actions that need human approval.

Deployment constraints

Document connectivity, data residency, private infrastructure, retention and local model availability.

Discuss a project